Problem

Two problems, separable, both rooted in how a change becomes a deployed release.

1. Chart version bumps conflict. Today bazel/helm/push.sh.tpl bumps the chart version on the PR branch: during PR CI, chart-version-bot computes the next semver from conventional commits, writes chart/Chart.yaml version: and deploy/application.yaml targetRevision:, and commits that back to the branch. A monotonic counter is being incremented on parallel branches, so any two concurrent PRs touching the same chart collide in one of two ways:

  • Duplicate version (out of sync): both PRs branch from 0.182.3, both compute 0.182.4. Whoever merges second publishes a colliding version that was already pushed to OCI.
  • Rebase conflict: both branches edited the same version: / targetRevision: line, so the second PR conflicts on rebase and needs manual resolution.

This is structural, not a bot tuning issue. The only conflict-free place to increment a serial counter is the serial timeline itself: main.

2. No pre-prod validation gate. A merge to main rolls straight to production via ArgoCD. There is no environment where a change is exercised against a real cluster, database, and ingress before it reaches prod. Now that nearly everything (KG, trips, ships, stars, dr-jobs, the public tier) runs inside one monolith, the blast radius of a bad merge is the whole estate, and the appetite for a validation step before promotion has grown.

The current design couples these: because the deployed version is written on the branch, the PR is simultaneously the unit of code review, the unit of versioning, and the unit of deploy. Decoupling versioning and promotion from the branch fixes (1) and creates the seam where (2) can live.


Decision

Separate versioning from promotion, and make main (not the PR branch) the single serial writer of every version string.

1. The version becomes an output of merging, not an input on the branch

PRs stop touching chart/Chart.yaml version: and deploy/application.yaml targetRevision: entirely. The chart version is computed and applied after merge, on main, where commits are serialized: CI computes the next semver from conventional commits, packages the chart at that version, and publishes it to the OCI registry. Because only main HEAD is ever advanced (and a publish reads the live HEAD value), there is no second writer and no collision. PR CI keeps building and pushing the ephemeral 0.0.0-dev.<ts>.g<sha> chart it already produces, so per-PR image/chart verification loses nothing.

2. Kargo owns promotion and every targetRevision write

Adopt Kargo as a post-merge promotion controller. A Warehouse subscribes to the monolith chart repo in OCI and discovers new Freight (a resolved set of artifact versions) by semver. Stages (dev then prod) receive Freight via Promotions, whose steps clone the repo, write the stage's targetRevision, commit, push, and trigger the ArgoCD sync. Kargo is therefore the only writer of any targetRevision, serialized by the controller, which removes the deploy-side half of the conflict problem for good. Promotion from dev to prod is gated on Argo Rollouts AnalysisRuns (synthetic checks: health/smoke probes plus the visual-regression suite already in flight on feat/public-visual-regression). Green promotes; red holds at dev.

3. The dev stage reuses ADR 005's data plane

The expensive part of a dev stage is giving it something realistic to test against without touching prod data or duplicating side effects. That mechanism is already designed in ADR 005: a copy-on-write CNPG clone of prod plus a single PR_ENV=true flag that mutes the scheduler loop and the Discord bot. The dev stage is a standing (not per-PR ephemeral) instance built from the same two primitives, behind Cloudflare Access. This means Kargo does not introduce a new data-plane problem; it consumes one ADR 005 already solved on paper.

AspectTodayDecided
Where the version is setOn the PR branch, by chart-version-bot in PR CIOn main, post-merge, as a publish output
Chart.yaml / targetRevision in a PR diffYes (and conflicts)No (PRs never touch them)
Concurrent-PR collisionsDuplicate versions and rebase conflictsImpossible (single serial writer)
Who writes targetRevisionchart-version-bot on the branchKargo, per stage, serialized
Path to prodMerge to main → ArgoCD syncs prod directlyMerge → publish → Kargo dev → verify → promote prod
Pre-prod validationNoneSynthetic AnalysisRuns gate devprod

Architecture

mermaid
graph TD
    PR[PR merges to main<br/>no version edits in diff] --> CI[main CI: compute semver,<br/>package + push OCI chart]
    CI --> OCI[(OCI chart repo<br/>ghcr.io/.../charts)]
    OCI --> WH[Kargo Warehouse<br/>subscribe by semver -> Freight]
    WH --> SDEV[Kargo Stage: dev<br/>promotion writes targetRevision]
    SDEV --> ADEV[ArgoCD app monolith-dev]
    ADEV --> PODS[dev monolith<br/>PR_ENV=true: no scheduler/bot<br/>CoW CNPG clone of prod]
    SDEV --> AR[AnalysisRun<br/>health/smoke + visual regression]
    AR -->|green| SPROD[Kargo Stage: prod<br/>promotion writes targetRevision]
    AR -->|red| HOLD[hold at dev,<br/>no prod promotion]
    SPROD --> APROD[ArgoCD app monolith]
    APROD --> PROD[(production monolith)]

Alternatives Considered

  • Post-merge bump only, no Kargo. The minimal fix for Problem 1: move the bump to main, keep ArgoCD syncing prod directly. Fully solves the conflicts with zero new infrastructure and is the industry-standard shape (semantic-release, release-please). Rejected as the complete answer because it does nothing for Problem 2, but adopted as the first increment and as the fallback if the dev stage proves too costly: it is a strict prerequisite of the Kargo design above, not a competing one.
  • Keep the branch-side bump, serialize with a GitHub merge queue. A merge queue rebases and tests PRs one at a time, so versions would no longer collide. Rejected: it still writes the version on a branch (now the queue's ephemeral branch), adds queue latency to every merge, and delivers no validation environment. It treats the symptom (concurrency) rather than the cause (version-as-branch-input).
  • Floating targetRevision (digest or * range). Let ArgoCD track the newest chart automatically, removing the pinned string entirely. Rejected: loses the auditable, git-recorded "what is deployed" pin this repo deliberately keeps, and removes the natural gate point a staged promotion needs.
  • ArgoCD Image Updater. Already rejected repo-wide (see CLAUDE.md): the operative path is build-time-pinned tags plus chart-version bumps, not Image Updater. Kargo is the promotion-layer successor to that idea, not a return to it.
  • Kargo as a prod-only promotion engine (no dev stage). Run Kargo with a single prod stage purely to own the targetRevision write. Viable, and it would fix the conflicts, but it adds a controller and CRDs while delivering no more validation than the post-merge-bump alternative. Rejected as a destination (it pays for Kargo without using what Kargo is for) while remaining a sensible intermediate step on the way to the dev stage.

Security

Follows the baseline in docs/security.md.

  • dev data isolation. The dev stage inherits ADR 005's guarantees: a copy-on-write clone means it physically cannot write back to production blocks, and PR_ENV=true means it holds no Discord connection and runs no scheduler, so it emits no duplicate outbound actions.
  • dev exposure. The dev origin sits behind a Cloudflare Access policy (trusted tier), never public, reachable by Joe and by CI/Claude via an Access service token, exactly as ADR 005 specifies for previews.
  • Kargo's git write credential. Kargo needs a token to commit targetRevision changes. Scope it to this repo, store it as a OnePasswordItem-sourced secret (never hardcoded), and confine its writes to the deploy app files. This is a new write-capable credential in the cluster and is the main new surface.
  • Promotion authority. Auto-promotion to prod is driven by AnalysisRun verdicts. A compromised or buggy analysis template could green-light a bad release; treat the templates as production code (reviewed, version-controlled) and keep a manual-approval option on the prod stage as a backstop.

Risks

RiskLikelihoodImpactMitigation
Standing dev monolith + CNPG clone exhausts node memory (node-2 already ~92%)HighHighStart the dev stage on monolith-public (read-only tier, no write data plane) before the full monolith; cap the clone at instances: 1; size dev minimally
Post-merge bump races two near-simultaneous main mergesLowMediumThe bump step does git pull --rebase + retry before committing; it is the only writer of that line, so a retry always converges
Kargo controller/CRDs add platform maintenance burdenMediumMediumPin a known-good Kargo release via its upstream chart (no custom chart); treat as platform infra under ArgoCD like Linkerd/SigNoz
Synthetic checks are too weak and green-light a bad prod releaseMediumHighBegin with health/smoke + visual regression already being built; expand coverage over time; keep manual approval available on prod
dev clone drifts stale vs prod schema/dataMediumLowClone is a point-in-time fork refreshed on promotion; forward-only Atlas migrations apply cleanly on the clone (per ADR 005 open question 3)
Version computation loses its source of truth once not committed per PRLowMediumCompute from conventional commits over the chart's Bazel dep closure as today (chart-version.sh), reading the live main Chart.yaml, which is still committed post-merge
Adopting Kargo without finishing ADR 005 leaves the dev data plane unbuiltMediumHighThe post-merge-bump increment ships independently; the Kargo dev stage is gated on ADR 005's PR_ENV + CoW-clone primitives existing

Open Questions

  1. Does Chart.yaml version: still get committed to main, or only emitted as the OCI tag? Committing it keeps chart-version.sh's "last version commit" heuristic working unchanged and keeps git as the audit record. Not committing it removes the last git write entirely but needs a new version source (latest OCI tag or git tag). Leaning toward still committing on main (serial, conflict-free) for the first cut.
  2. One Kargo Warehouse/project per service, or one shared? monolith and monolith-public are the two active charts; a shared project is simpler but couples their Freight timelines.
  3. dev stage scope for v1: monolith-public only, or the full monolith? monolith-public is the cheaper, lower-risk first stage (no write data plane to reproduce) and exercises the public surface the visual-regression suite already targets.
  4. Auto-promote to prod, or require manual approval after green dev? Auto is the full payoff; manual-with-green-required is the safer starting posture.
  5. Refresh cadence of the dev CoW clone: on every promotion (freshest, more snapshot churn) versus on a schedule.

References

ResourceRelevance
ADR 005: Per-PR Preview EnvironmentsSource of the CoW CNPG clone + PR_ENV muting the dev stage reuses
Kargo documentationWarehouse/Stage/Freight/Promotion model and OCI semver subscription
Kargo: Promotion Stepsgit-clone / write / git-commit / argocd-update steps that own targetRevision
Argo Rollouts AnalysisTemplateSynthetic verification mechanism gating dev->prod
bazel/helm/push.sh.tplCurrent branch-side bump logic this ADR moves post-merge
bazel/helm/chart-version.shConventional-commit semver computation, reused on main
Conventional release tooling (semantic-release, release-please)Prior art for default-branch, post-merge version bumps